Leading foundation and piling specialist Stent is preparing the ground for an iconic piece of architecture that will be Europe’s tallest mixed use building.
When it is complete in 2012, The Shard will reach 310m into the sky above Southwark. But before main contractor Mace can begin construction of the stunning 80-storey tower, substantial loadbearing works are required.
The full press release can be found here.